Change Management Preview Every Change Before It Goes Live

Safe, Controlled Configuration

  • ZHERO
  • 5
  • Change Management – Safe, Controlled Zscaler Configuration
3

Scroll Down

ZHERO’s proprietary Pending Changes Engine lets you stage, review, and validate all configuration modifications before applying them — eliminating the fear of breaking production policies.

Three-Stage Safety System

95% reduction in configuration errors withpre-commit validation
Every Zscaler change carries risk. One wrong move can break user access, create security gaps, or cause widespread outages

Without ZERO

With ZHERO

Without ZERO

❌ Changes apply immediately to production

With ZHERO

✅ Stage all changes before applying

Without ZERO

❌ No way to preview cumulative impact

With ZHERO

✅ Preview exact impact with diff visualization

Without ZERO

❌ Difficult rollback if something breaks

With ZHERO

✅ Rollback before commit capability

Without ZERO

❌ Multiple admins can create conflicts

With ZHERO

✅ Export pending changes for review (Coming Soon)

Intelligent Queue Management

  • Accumulate unlimited changes
  • Filter by change or policy type
  • Reorder for optimal application

Visual Change type Tracking

  • 🔵 Update – Passed conflict checks
  • 🟢 Create – Approved for application
  • 🔴 Delete – Requires resolution
R

Selective Application

  • Apply all changes at once
  • Cherry-pick specific changes
  • Defer certain changes for later
  • Cancel changes without impact

Advanced Diff Visualization

See Every Detail Before Committing

Context Preservation

See changes in context of full configuration, not just isolated modifications.

Watch a 4 minutes demo:

Ready to Transform Your Zscaler Experience?

Talk to Our Team!